Current operations
The Current Operations will produce more than 155,000t of copper concentrate at 35-40% copper content, containing some c.60kt of copper and c.1.6Moz of silver metal in concentrate annually. First concentrate was produced in June 2021.
Read moreExpansion project
The Expansion Project is expected to produce in excess of c.130,000 tonnes of copper and c.5.0Moz of silver metal in concentrate per annum (average run rate at full production).
Read moreGeology and exploration
Our 4,040km2 property is located in the most prospective and largely underexplored area of the Kalahari Copper Belt. Substantial exploration pipeline, with multiple targets expected to advance the next wave of deposits beyond the Current Operations and Expansion Project.
Read moreMineral Resources and Ore Reserve Estimate
All Mineral Resource estimates were completed using Datamine RM, Hexagon Mining’s HxGN Mine Plan 3D or MineSight software. A resource classification procedure defined by the number of drill holes and average distances to composites was used to classify blocks as Measured, Indicated or Inferred.
Read more